RPM: SHIP CONTRACT LINES
Shipping Contract Lines
When a contract is ready to ship, there are two options to ship contract lines from a contract.
See "Printing a Shipping Document".
- The fact box on the right side of the contract screen has a "Next Dates" section. Select the date next to "Shipment". This will open the RPM Shipping/Receiving Lines page.
- Review and select/deselect the lines to be shipped.
- When the lines are ready, select Posting, Post in the top ribbon.
Option 2
- Select Home, Shipping/Receiving in the top ribbon of the contract page.
- Review and select/deselect the lines to be shipped.
- When the lines are ready, select Posting, Post in the top ribbon.
See "Printing a Shipping Document".